# Free design-build agreement review tool

Source: https://contracko.com/tools/design-build-agreement-review

# Free design-build agreement review tool

Upload a design-build agreement and get instant AI analysis of single-point responsibility, the design standard of care, GMP versus lump-sum pricing, the owner’s program and criteria, change management, and performance warranties.

Upload your contract to start your free analysis

Drag and drop your contract here, or browse files

PDF or DOCX, max 25MB, up to 100 pages

What we'll analyze

Our AI engine reviews your contract and extracts key insights across multiple dimensions:

Risk assessment

Overall risk score with specific concerns

Key dates

Start, end, renewal, and notice deadlines

Obligations

Your duties and counterparty requirements

Financial terms

Pricing, payment terms, and penalties

Red flags

Unusual or concerning clauses

Liability & indemnity

Caps, exclusions, and indemnification

Your privacy, guaranteed

Enterprise-grade encryption

Never used for AI training

GDPR compliant

Deleted after analysis

## Frequently asked questions

Common questions about our design-build agreement review

- **Q:** What does this design-build agreement review tool check?
  **A:** It analyzes the single-point responsibility for design and construction, the design standard of care (and whether it imports a fitness-for-purpose obligation), the pricing basis (guaranteed maximum price versus lump sum, including the savings/shared-savings mechanism), how the owner’s program and performance criteria are defined, the change-management process, and the performance warranties. Both parties’ obligations are extracted and listed.

- **Q:** Does it check whether pricing is GMP or lump sum?
  **A:** Yes. The tool identifies whether the contract uses a guaranteed maximum price (with a cost basis, contingency and shared-savings terms) or a fixed lump sum, and flags how cost overruns and savings are allocated between owner and design-builder.

- **Q:** Will it flag the design standard of care?
  **A:** It locates the standard-of-care clause and flags whether it holds the design-builder to ordinary professional care or to a higher fitness-for-purpose/performance guarantee, which can fall outside professional-liability insurance.

- **Q:** How long does the design-build agreement analysis take?
  **A:** Most design-build agreements are analyzed in under 30 seconds.

- **Q:** What file formats can I upload?
  **A:** PDF and Word (DOCX) files are both supported.

- **Q:** Is my design-build agreement data secure?
  **A:** Yes. Your document is transmitted over TLS encryption, processed by AI providers under terms that exclude training on your data, and deleted from our servers within 24 hours.

## Try our other contract analysis tools

Specialized analyzers for specific contract types with tailored insights and recommendations.

### [EPC contract review](https://contracko.com/tools/epc-contract-review)

### [Construction contract review](https://contracko.com/tools/construction-contract-review)

### [Subcontractor agreement review](https://contracko.com/tools/subcontractor-agreement-review)

[View all contract analysis tools](https://contracko.com/contract-analysis-tools)

## Get started with Contracko

Take the hassle out of contract and subscription management. Contracko empowers you to stay organized, on time, and in control. Start simplifying today.

[Start 7-day free trial](https://app.contracko.com/register?appLanguage=en)

Book demo
