General Contractor Agreement
This General Contractor Agreement (the "Agreement") is entered into on 2023-10-01 (the "Effective Date") by and between Owner Name ("Owner") with an address of 123 Owner St and Contractor Inc. ("Contractor") with an address of 456 Contractor Rd.
1. Project Description
Project Name: Home Renovation
Property Address: 123 Owner St
Property Description: Single Family Home (lot/parcel number, legal description if applicable)
Project Type: Renovation (new construction, renovation, addition, remodeling, etc.)
Detailed Scope of Work: Kitchen and Bath Remodel
Attached Plans: Plans and specifications attached as:
- Architectural drawings: A1-A5
- Engineering plans: S1-S2
- Specifications: Spec Book v1
- Other: None
All work shall be performed according to attached plans and specifications
2. Contract Price
Total Contract Price: $50000
Price Includes:
- All labor
- All materials (unless specified otherwise)
- Equipment and tools
- Subcontractor costs
- Permits and fees: Included
- Cleanup and disposal
- None
Price Does NOT Include: Furniture
Allowances: The following allowances are included in the contract price:
- Cabinets: $10000
- Flooring: $5000
- Fixtures: $2000
Selections exceeding allowances will result in additional charges; unused allowances will credit to Owner
3. Payment Schedule
Payment Terms:
| Milestone/Phase | Description | Amount | Due Date/Trigger |
|---|---|---|---|
| Deposit | Upon signing | $5000 | 2023-10-01 |
| Foundation | Foundation completed and inspected | $10000 | Inspection Pass |
| Framing | Framing and roof completed | $10000 | Roof On |
| Rough-In | Electrical/plumbing/HVAC rough-in | $10000 | Rough Inspection |
| Drywall | Drywall completed | $5000 | Tape and Texture |
| Finish | Finishes and fixtures installed | $5000 | Substantial Completion |
| Final | Upon substantial completion | $5000 | Upon punch list completion |
Payment Method: Check
Payment Timing: Payments due within 15 days of invoice
Retainage: 10% of each payment retained until final completion
Final Payment: Released upon:
- Substantial completion
- Passing all inspections
- Lien releases from all subcontractors
- Completion of punch list
- Delivery of warranties and manuals
4. Project Timeline
Commencement Date: 2023-10-15
Substantial Completion Date: 2024-01-15
Final Completion Date: 2024-02-01
Total Duration: Approximately 100 calendar days
Work Schedule: Work performed Mon-Fri from 8am-5pm
Liquidated Damages: If Contractor fails to substantially complete by 2024-01-15, Owner may deduct liquidated damages per day (if applicable)
Time Extensions: Contractor entitled to time extension for:
- Owner-requested changes
- Weather delays exceeding weather allowance days days
- Unforeseen conditions
- Delays in Owner selections/approvals
- Force majeure events
Must request extension in writing within extension request days days of delay
5. Change Orders
Definition: Any change to scope, specifications, schedule, or price requires written change order
Process:
- Contractor provides written proposal with cost and time impact
- Owner reviews and approves/rejects
- Both parties sign change order before work proceeds
Emergency Changes: Contractor may proceed with emergency work to prevent damage, with notification to Owner within emergency notification hours hours
No Oral Changes: Oral agreements are not enforceable; all changes must be in writing
Pricing: Change order work priced at:
- Actual costs plus change order markup% markup, OR
- Fixed price as agreed in change order
6. Permits and Compliance
Responsibility: Contractor responsible for obtaining all necessary permits and licenses
Permit Costs: permit cost responsibility (included in contract price / Owner pays separately)
Building Codes: All work performed in compliance with:
- Local building codes
- State and federal regulations
- Manufacturer specifications
- Attached plans and specifications
Inspections: Contractor responsible for scheduling required inspections and ensuring work passes
Zoning: Owner represents that project complies with zoning regulations: zoning compliance
Failed Inspections: Contractor responsible for correcting work that fails inspection at no cost to Owner
7. Materials and Workmanship
Materials Quality: All materials shall be new and of quality specified in plans or, if not specified, of good quality suitable for purpose
Substitutions: Contractor may not substitute materials without Owner's written approval
Material Approval: Samples of the following require Owner approval before installation: materials requiring approval
Workmanship: All work performed in professional and workmanlike manner according to industry standards
Defective Work: Contractor shall promptly correct defective work at no cost to Owner
8. Subcontractors and Employees
Subcontractors: Contractor may use subcontractors for: anticipated subcontractors
Subcontractor Approval: Owner approval required: subcontractor approval required
Contractor Responsibility: Contractor responsible for all work performed by subcontractors
Lien Releases: Contractor shall provide lien releases from all subcontractors and suppliers before final payment
Background Checks: All persons working on site: background check requirements
Supervision: Contractor shall maintain qualified supervisor on site during work hours
9. Insurance and Bonding
Contractor Insurance: Contractor maintains:
- General Liability: gl insurance amount
- Workers' Compensation (as required by law)
- Auto Liability: auto insurance amount
- Builder's Risk: builders risk terms
Owner as Additional Insured: Owner named as additional insured on liability policy
Proof of Insurance: Provided before work commences and upon renewal
Performance Bond: performance bond (if required)
Payment Bond: payment bond (if required)
10. Site Access and Conditions
Site Access: Owner provides Contractor access to property during work hours
Utilities: Owner provides access to: utilities provided
Storage: Contractor may store materials and equipment on site: onsite storage terms
Site Security: Contractor responsible for securing site: site security requirements
Existing Structures: Contractor shall protect existing structures, landscaping, and improvements: protection requirements
Hazardous Materials: Owner represents that property is free of hazardous materials: hazmat representation
If hazardous materials discovered, work stops and parties negotiate remediation
11. Changes in Work Conditions
Concealed Conditions: If Contractor encounters conditions materially different from expected (concealed damage, structural issues, etc.):
- Contractor stops work in affected area
- Notifies Owner within condition notification hours hours
- Documents conditions with photos
- Parties negotiate change order for additional work
Differing Site Conditions: Contract price may be adjusted for differing subsurface or physical conditions
12. Owner's Responsibilities
Owner agrees to:
- Provide clear access to site
- Make timely decisions and selections
- Provide utilities as specified
- Make payments according to schedule
- Obtain financing (if applicable)
- Designate representative: owner representative
- Respond to requests for information within owner response days days
- Review and approve/reject submittals within submittal review days days
- Not interfere with Contractor's work
- additional owner responsibilities
13. Warranties
Workmanship Warranty: Contractor warrants all work free from defects in workmanship for workmanship warranty years year(s) from substantial completion
Warranty Coverage: Warranty covers:
- Defective workmanship
- Improper installation
- Work not conforming to contract documents
Warranty Exclusions: Does not cover:
- Normal wear and tear
- Damage from misuse or lack of maintenance
- Damage from modifications by others
- Acts of nature
- Owner-supplied materials
Manufacturer Warranties: Contractor shall obtain and transfer to Owner all manufacturer warranties for materials and equipment
Systems: Specific system warranties:
- Roofing: roofing warranty
- HVAC: hvac warranty
- Plumbing: plumbing warranty
- Electrical: electrical warranty
Warranty Service: Contractor shall correct warranty defects within warranty response days days of notice
14. Cleanup and Final Completion
Ongoing Cleanup: Contractor shall maintain clean and safe site, removing debris regularly
Final Cleanup: Upon completion, Contractor shall:
- Remove all materials, equipment, and debris
- Clean all surfaces
- Ensure all systems operational
- Repair damage caused by work
- Leave property in broom-clean condition
Owner Walkthrough: Contractor shall conduct walkthrough with Owner to identify punch list items
Punch List: Contractor shall complete punch list items within punchlist days days
Substantial Completion: Occurs when work sufficiently complete for Owner's intended use and only punch list items remain
Certificate of Completion: Contractor provides certificate of substantial completion
15. Termination
Termination by Owner for Cause: Owner may terminate if:
- Contractor abandons work
- Fails to perform work according to schedule
- Fails to correct defective work
- Violates material terms
- Becomes insolvent
Owner must provide cure period days days notice to cure
Termination by Owner for Convenience: Owner may terminate for any reason with convenience termination days days notice. Owner shall pay for work completed plus reasonable termination costs
Termination by Contractor: Contractor may terminate if:
- Owner fails to make payments
- Work suspended by Owner for more than suspension termination days days
- Owner breaches material terms
Contractor must provide contractor termination days days notice
Effect of Termination: Upon termination:
- All work stops (except securing site)
- Contractor removes equipment
- Contractor provides lien releases
- Final accounting prepared
- Contractor paid for work completed less amounts owed to Owner
16. Indemnification and Liability
Contractor Indemnifies Owner: Against claims arising from:
- Contractor's negligence or misconduct
- Injury to persons or property caused by Contractor's work
- Contractor's breach of this Agreement
- Lien claims by subcontractors or suppliers
Owner Indemnifies Contractor: Against claims arising from:
- Owner's negligence
- Owner-supplied materials or equipment
- Owner's breach of this Agreement
- Pre-existing property conditions disclosed by Owner
Limitation of Liability: Contractor's total liability shall not exceed liability cap (typically the contract price)
17. Dispute Resolution
Governing Law: This Agreement governed by laws of governing jurisdiction
Dispute Resolution:
- Good faith negotiation
- Mediation in mediation location
- binding resolution (binding arbitration / litigation)
Arbitration Rules: If arbitration selected, conducted under arbitration rules (e.g., AAA Construction Rules)
Continue Working: Unless terminated, Contractor shall continue working during dispute resolution
Attorney Fees: Prevailing party entitled to reasonable attorney fees and costs
No Liens: Contractor agrees not to file mechanics liens if Owner making payments according to this Agreement
18. Miscellaneous
Entire Agreement: This Agreement, including all attached exhibits, constitutes entire agreement
Amendments: Must be in writing signed by both parties
Assignment: Neither party may assign without written consent
Severability: Invalid provisions do not affect remaining terms
Notices: Written notices to addresses above or:
- Owner email: owner email, phone: owner phone
- Contractor email: contractor email, phone: contractor phone
Survival: Warranties, indemnification, and confidentiality survive completion
Force Majeure: Neither party liable for delays due to circumstances beyond reasonable control
No Third-Party Beneficiaries: This Agreement benefits only the parties (and their successors)
Waiver: Failure to enforce any term does not waive future enforcement
Photographs: Contractor may photograph project for portfolio: photo rights
19. Licenses and Qualifications
Contractor License: Contractor holds license number 123456 issued by licensing authority
Specialty Licenses: Subcontractors performing specialty work hold required licenses
Liability for Unlicensed Work: Owner aware that unlicensed work may affect rights and remedies: licensing disclosures
20. Signatures
IN WITNESS WHEREOF, the parties have executed this Agreement as of the Effective Date.
OWNER
Date: 2023-10-01
Name: Owner Name
Signature: _____________________________
CONTRACTOR
Date: 2023-10-01
Name: Contractor Inc.
License Number: 123456
Signature: _____________________________
Attachments:
- Exhibit A: Plans and Specifications
- Exhibit B: Payment Schedule
- Exhibit C: Scope of Work Detail
- Exhibit D: Allowances and Selections
- Exhibit E: Insurance Certificates